[1]
2022. Planning the Production of the Electrical Distribution Converter (400KV/11) Using Time Series Methods and Goal Programming in the Fuzzy Environment. Journal of Economics and Administrative Sciences. 28, 131 (Mar. 2022), 1–23. DOI:https://doi.org/10.33095/jeas.v28i131.2231.