[1]
2024. A Linear Programming Method for Finding the Critical Path and the Desired Time to Complete the Project. Journal of Economics and Administrative Sciences. 30, 142 (Sep. 2024), 550–577. DOI:https://doi.org/10.33095/knc31b61.