[1]
2016. Evaluation of projects during the trial operation period in accordance with the cost, quality and time - applied research in the Directorate-General for the distribution. Journal of Economics and Administrative Sciences. 22, 93 (Nov. 2016), 142. DOI:https://doi.org/10.33095/jeas.v22i93.428.