[1]
2020. Using the Critical Path Method (CPM) for scheduling the project (paving the Amil Sayid Al-Ayyam Street with a length of 1.25 km) In terms of Decresing the time. Journal of Economics and Administrative Sciences. 26, 120 (Jun. 2020), 127–145. DOI:https://doi.org/10.33095/jeas.v26i120.1909.