(1)
Using the Critical Path Method (CPM) for Scheduling the Project (paving the Amil Sayid Al-Ayyam Street With a Length of 1.25 Km) In Terms of Decresing the Time. JEAS 2020, 26 (120), 127-145. https://doi.org/10.33095/jeas.v26i120.1909.