(1)
Prepare a Plan for the Total Productive Maintenance in the Light of the Concurrent Engineering A Field Study in AL-Askandria General Company Machanical Industries and AL-Musaib Electric Power Station. JEAS 2018, 21 (84), 186. https://doi.org/10.33095/jeas.v21i84.695.