Using the Critical Path Method (CPM) for scheduling the project (paving the Amil Sayid Al-Ayyam Street with a length of 1.25 km) In terms of Decresing the time. (2020). Journal of Economics and Administrative Sciences, 26(120), 127-145. https://doi.org/10.33095/jeas.v26i120.1909