“Using the Critical Path Method (CPM) for Scheduling the Project (paving the Amil Sayid Al-Ayyam Street With a Length of 1.25 Km) In Terms of Decresing the Time”. 2020. Journal of Economics and Administrative Sciences 26 (120): 127-45. https://doi.org/10.33095/jeas.v26i120.1909.