جواد م.ك. and كاظم ع.ج. (2020) “Using the Critical Path Method (CPM) for scheduling the project (paving the Amil Sayid Al-Ayyam Street with a length of 1.25 km) In terms of Decresing the time”, Journal of Economics and Administrative Sciences, 26(120), pp. 127–145. doi:10.33095/jeas.v26i120.1909.