“The Method of ABC and It, S Roules in the Determining the Cost of the Project Constraction Sector”. Journal of Economics and Administrative Sciences, vol. 19, no. 72, Sept. 2013, p. 32, https://doi.org/10.33095/jeas.v19i72.944.