Project Scheduling By using Goals Programming – An Applied Research In Modern Village Project (Residential Building Aspectin In Wasit Governorate)
DOI:
https://doi.org/10.33095/jeas.v21i85.741Keywords:
جدولة المشروع, العلاقات غير التقليدية بين الانشطة، التقديم والتاخير بين الانشطة، المسار الحرج، برمجة الأهداف, Project Scheduling, Unconventional relations among activities , Lead and Lag Between Actictives, goal programmingAbstract
One of the most important challenges facing project management at present time is to ensure project accomplishment in spite of the specific restrictions like the specific time the financial resources specialized to do the project ; which require an accurate consideration for time and cost . the modern village project (residential building aspect) is one of the great project that ministry of agriculture is trying to do Wasit governorate it is chosen as the work in this project is dilatory for that is being studied in term of some modern mathematical and scientific methods like critical path method (CPM)which is one of the project management and scheduling methods to know the time needed to accomplish residential building project , with acknowledgement that many activities of project net are of unconventional relations among each others (of type finish to start) ; and there are periods of (lead and lag) among each other for that reason , (primavera V6) program is used in project scheduling and management which is one of prime programs to find the time and cost of project accomplishment at normal and crash states ; and as project management has numerous goals , same of them are contradictory which are trying to do in one time and that require great working and decision-makers face difficulty to reach into accurate and suitable decisions (goal programming) method is used which is one of efficient and mathematical method to achieve the objectives the results obtained of the mathematical model solution with the use of (win Q.S.B V2) program show the importance and efficiency of this method in modern village project scheduling (residential building aspect) under numerous contrasted goal that project management determined according to their importance and to be achieved according to their importance and to be achieved in one time
Downloads
Published
Issue
Section
License
Articles submitted to the journal should not have been published before in their current or substantially similar form or be under consideration for publication with another journal. Please see JEAS originality guidelines for details. Use this in conjunction with the points below about references, before submission i.e. always attribute clearly using either indented text or quote marks as well as making use of the preferred Harvard style of formatting. Authors submitting articles for publication warrant that the work is not an infringement of any existing copyright and will indemnify the publisher against any breach of such warranty. For ease of dissemination and to ensure proper policing of use, papers and contributions become the legal copyright of the publisher unless otherwise agreed.
The editor may make use of Turnitin software for checking the originality of submissions received.