An Integrated Approach to Constraints Theory and Fuzzy Analytical Hierarchy Process (FAHP) in Construction Projects (Case Study)

Authors

  • Mohammed jassim Nassir*
  • Nagham Yousef Abdul Redha

DOI:

https://doi.org/10.33095/4bgyes38

Keywords:

Project Management, Constraint Theory , Accelerated Project Management, fuzzy AHP, Cost and time relation, fuzzy logic.

Abstract

The research endeavors to harness the benefits stemming from the integration of constraint theory into construction project management, with the primary goal of mitigating project completion delays. Additionally, it employs fuzzy analysis to determine the relative significance of fundamental constraints within projects by assigning them appropriate weights. The research problem primarily revolves around two key issues. Firstly, the persistent utilization of outdated methodologies and a heavy reliance on workforce experience without embracing modern computerized technologies. Secondly, the recurring problem of project delivery delays.

Construction projects typically encompass five fundamental constraint types: cost restrictions, time constraints, administrative and legal limitations, technical and design constraints, and environmental constraints. To address these issues, a field study was conducted, focusing on the development of a housing complex in Qa'imaqamiya, Al-Mada'in district, Bismayah. The researchers propose a three-stage methodology to tackle these challenges. In the initial stage, the theory of accelerated activities is applied to all concurrent implementable tasks. Subsequently, the second stage introduces a hierarchical analysis process, known as FAHP, to quantify the importance of each constraint. Finally, in the third phase, fuzzy logic is employed to calculate the projected duration and associated costs for each activity, ensuring project execution and delivery within agreed-upon timeframes. After applying the proposed methodology, there is a reduction in completion time by up to (23%).

Research Type: Research Paper

Downloads

Download data is not yet available.

References

Abdul, A. and Hassan, J.,( 2018). Planning And Scheduling The Implementation Of Government Project. Journal Of Accounting And Financial.

Ahmad, M. A. and Khalaf, W. S.,( 2016). Material Requirements Planning for the Electric Motor in Fuzzy Environment for State Company for Electric Industries. Journall of Economiics and Admiiniisttrattiive Sciiences, Vol.22,No.90 pp. 170-197.

Al-Raikabi, E. H. K., (2019). Using The Project Management Maturity, Odel To Evaluate The Construcation Sector Organization, A Cas Study In The Department Of Building - Karkh First. Masters Thesis In Business Administration ed. s.l.:Colleges Of Administratio.

Al-Sahlani, M. . K. and Dawood, F. S., (2022). Aapplicability Of The Specification ( Iso 21500:2021)At Al Ain University (Case Study). , Scientific Publications (Ecuador - South America) (Journal Impact Factor (Sjif 2020:6.553)., 30 يوليو, Vol.6,No.553, pp. 1-20.

Al-Sahlani, M. M.,( 2022). Applicability Of The Standard ( Iso 21500:2021), A Case Study In The Dhi Qar Investment Authority, A Master's Thesis In Strategic Planning. 1st ed. Baghdad: College Of Administration And Economics, University Of Baghdad..

Barfield, O. T., Raiborn, C. A. and Kinney, M.,( 2003). " Cost Accounting traditions and Innovations". edition 5 ed. s.l.:South-Western.

Faihan, I. A. H., (2011). "Production and Operations Management". First Edition ed. Iraq - Baghdad, : Dar Al-Kutub and Documents,.

Heagney, J., (2012). Fundamentals Of Project Management. Fourth Edition ed. Published By (Amacom) American Management Association: Printed In The United States Of America, Usa.

Horngren, C. T., datar, s. M. and rajan, m.,( 2012). "Cost Accounting: A managerial Emphasis". edition 14 ed. USA: Pearson Education, Inc., Pearson Prentice Hall.

Kalaf, W. S., (2022). Operations Research For Decision Support. Fist Edition ed. Amman, Jordan.: Dar Ghaida For Publishing And Distribution.

Kazem, A. J. and Jawad , M. K.,(2020). ," Using the Critical Path Method (CPM) for scheduling the project (paving the Amil Sayid Al-Ayyam Street with a length of 1.25 km) In terms of Decresing the time" Vo. Journal of Economics and Administrative Sciences , Vol. 1,No. 6, pp. 127-145.

Kazem, H. M. and Abdul Redha, N. Y.,( 2016). Performance evaluation of small and medium-sized enterprises according to the entrance of the scorecard applied study in company Al fadly for construction industries";. Journal of Economic and Administrative sciences economic and Administrative sciences , Vol.22,No.89, pp. 269-282.

Krajewski, L. J., (2010). Operations Management: Processes And Value Chains Global Edition. 9th Ed ed. Usa: Prentice Hall, Inc., Usa..

Krajewski, L. N. and Ritzman, L., (2016). "Operations Management (Process And Supply Chain"). 1st ed. England.: Global Edition - Pearson Education Limited.

Larson, . W. and Clifford , F., (2017). Project Management The Managerial Process Mcgraw. 1st ed. Usa: Hill Education.

Mhna, R. S. and Khalaf, W. S.,( 2019). The Time-Cost Trade-off to Manage A Project in a Fuzzy Environment. Journall of Economiics and Admiiniisttrattiive Sciiences, Vol.114,No.25, pp. 498- 522.

Muhammad, O., Sobeih, B. and Dawood, F.,( 2021). Strategy To Achieve Production Efficiency, Applied Research In Baghdad Soft Drinks Company. 1st ed. Baghdad: University Of Baghdad.”–Faculty Of Administration And Economics–Department Of Industrial Management,Lingu.

Utsav , . M. B. and Jayraj , V. . S.,(2020). IDENTIFICATION OF CONSTRAINTS IN CONSTRUCTION PROJECTS. International Research Journal of Engineering and Technology IRJET, Vol.07,No.05, pp. 6302-6307.

Uttpal , R., Indra, K. . P. and Vaibhav , W., (2021). Identification of Constraints in Construction Projects to Improve Performance. International Journal for Research in Applied Science and Engineering Technology IJRASET, Vol.09,No.01 pp. 710-713..

Zoukar, I., (2018). Project Management. Syrian: Published By the Syrian Virtual University.

Published

2024-11-03

Issue

Section

Managerial Researches

How to Cite

“An Integrated Approach to Constraints Theory and Fuzzy Analytical Hierarchy Process (FAHP) in Construction Projects (Case Study)” (2024) Journal of Economics and Administrative Sciences, 30(143), pp. 68–85. doi:10.33095/4bgyes38.

Similar Articles

31-40 of 1073

You may also start an advanced similarity search for this article.